Pre-construction Preparation
Environmental Assessment
Measure the working surface temperature; special measures are required if below -5℃.
Check for black ice on the ground.
Assess the impact of wind force; proceed with caution if wind speed exceeds level 4.
Standardized Equipment Preheating Process
Stage 1 (Engine Preheating)
Idle for 8-10 minutes after starting.
Observe the oil pressure to reach the normal range.
Stage 2 (Hydraulic System Preheating)
Slowly operate the leveling head raising and lowering 5-8 times.
Run the vibration system unloaded for 3 minutes.
Stage 3 (System Check)
Check the laser system's working status.
Verify that all functions on the control panel are normal.
Test the flexibility of the walking system.
Precautions During Construction
Precision Control Points
Calibrate the laser system every hour.
Monitor the actual working temperature of the leveling head.
Record flatness data and adjust parameters promptly.
Equipment Operation Monitoring
Maintain the hydraulic oil temperature within the optimal range of 30-50℃.
Engineering coolant temperature should not be lower than 70℃.
Observe the fluid... Pressure fluctuations exceeding 15% require machine shutdown and inspection.
Operating Technique Adjustments:
Reduce walking speed by 20-30% compared to summer.
Reduce sudden stops and starts to protect the hydraulic system.
Increase inspection points during construction handover.
Post-Work Maintenance Procedures:
Cleaning Operations:
1. Remove all concrete residue from the leveling head.
2. Clean tracks/tires and walking mechanism.
3. Wipe the laser equipment and cover it for protection.
4. Clean the radiator to prevent dust blockage.
Anti-freezing Treatment:
Drain the water tank (if the equipment has a water spray system).
Check for water accumulation inside the equipment.
Apply anti-rust oil to critical parts.
Storage Requirements:
Store indoors or under a rain/snow cover.
Lower the leveling head to its lowest position.
Disconnect the negative terminal of the battery (if long-term storage is required).
Temperature Grade Management Strategy:
Mild Cold (0℃ to -5℃):
Perform routine winter maintenance.
Monitor changes in concrete initial setting time.
Provide basic anti-freezing protection at night.
Moderate Cold (-5℃): (Up to -15℃)
Increase start-up preheating time by 50%
Use low-temperature hydraulic oil
Calibrate the laser system every 2 hours
Consider increasing external insulation for the equipment
Severe cold (below -15℃)
Outdoor construction is recommended to be suspended. If construction is necessary, special measures must be taken:
Complete equipment insulation coverage
Erect temporary heated shelters in the work area
Use industrial heaters to maintain localized temperatures
Keep equipment idling during construction breaks
Regular Maintenance Schedule
Daily Maintenance
Laser system cleaning and calibration
Hydraulic oil level and contamination check
Critical bolt tightness check
Track/tire condition check
Battery charge test
Weekly Maintenance
Comprehensive hydraulic system inspection
Deep laser system calibration
Electrical system insulation test
Lubricant replacement and replenishment
Safety device function test
Monthly Maintenance
Hydraulic oil contamination laboratory analysis
Comprehensive engine inspection
Measurement and replacement of worn parts on the leveling head
All Vehicle Wiring Harness System Inspection
Comprehensive Operational Performance Assessment
Common Winter Fault Emergency Handling
Laser System Malfunction
Symptoms: Unstable signal, large accuracy deviation
Emergency Measures:
1. Immediately stop construction
2. Check lens cleanliness
3. Verify ambient light interference
4. Restart the laser system
5. If ineffective, activate manual backup measurement
Hydraulic System Abnormality
Symptoms: Slow movement, pressure fluctuation
Troubleshooting Steps:
Stop the machine and check the hydraulic oil temperature
Check for filter blockage
Investigate hydraulic pipeline leaks
Consider the low-temperature adaptability of the oil
Possible Causes of Uneven Vibration of the Leveling Head:
Hydraulic oil temperature too low
Vibration motor failure
Loose mechanical connection
Troubleshooting Sequence:
1. Preheat the hydraulic system
2. Check motor fixing bolts
3. Test vibration frequency
4. Check transmission components
Conclusion: The core of winter maintenance for laser leveling machines lies in "proactive maintenance" and "precise operation." Every degree of temperature drop requires us to raise our maintenance standards; every severe cold challenge is a test of equipment management capabilities.
Remember: The quality of winter construction lies in the preheating before each start-up, in the cleaning after each day's work, and in the persistent calibration every week.
Proper maintenance ensures precision; attentive care ensures quality. Let us safeguard the precise operation of your laser leveling machine with professional winter maintenance!
Leave A Reply
We specialize in Aerial work platform truck, Concrete mixer truck, Truck crane, Concrete mixer Drum, Spider crane, Dumper truck, Road sweeper, Laser levelling machine, Pneumatic crane, Wheel loader and so on.
Contact
Get a Quote